The standard helps requirements of IEEE Std are universally needed stakeholders in DR installations implement optional for interconnection of distributed resources that include approaches for monitoring, information exchange, and both distributed generators and energy storage systems control to support the operation of their DR and transactions among the stakeholders associated with the. IEEE Std DR island systems monitoring, information exchange, and control related are EPSs that: 1 include DR and load, 2 have the to distributed resources interconnected with an area ability to disconnect from and parallel with the area EPS.

The focus is on monitoring, information EPS, 3 include the local EPS and may include exchange, and control data exchanges between DR portions of the area EPS, and 4 are intentionally controllers and stakeholder entities with direct planned.

DR island systems can be either local EPS communication interactions. This guide incorporates islands or area EPS islands. One reason for the information modeling and uses case approaches, but it popularity of microgrids is that local power generation is also compatible with historical approaches to and storage allow portions of the grid and critical establishing and satisfying monitoring, information components to operate independent of the larger grid exchange, and control needs for DR interconnected when needed Figure 2.

Another reason is that during with an area EPS. It also provides distribution system impact studies are appropriate, what alternative approaches and good practices for the data is required, how they are performed, and how the design, operation, and integration of DR island systems study results are evaluated.

In the absence of such with EPS. This includes the ability to separate from and guidelines, the necessity and extent of DR reconnect to part of the area EPS while providing interconnection impact studies has been widely and power to the islanded EPSs. This guide includes inconsistently defined and applied. This P It to the requirements set forth in IEEE Std and establishes recommended criteria, requirements, and provides recommended methods that may expand the tests, and provides guidance for interconnection of usefulness and utilization of IEEE Std through the distribution secondary network system types of area identification of innovative designs, processes, and EPS with DR providing electric power generation in operational procedures.

The purpose of the methods and local EPS. Further, based on generation. The recommended practice provides IEEE Std requirements, the purpose of this recommendations relevant to the performance, recommended practice is to provide the knowledge operation, testing, safety considerations, and base, experience, and opportunities for greater maintenance of the interconnection.

Equally, the standard addresses the plans. The P The creation of IEEE Std had led to the alternative approaches and best practices for achieving increased interconnection of DR throughout distribution smart grid interoperability. It is the first all- systems. The scope and national and international body of standards based on extent of the impacts study are described as functions of cross-cutting technical disciplines in power applications identifiable characteristics of DR, the area EPS, and the and information exchange and control through interconnection.

Criteria are described for determining communications Figure 3. Reference Models. Figure 3. Evolution of smart grid interoperability.

Guidelines for smart grid interoperability, design Integration of energy technology and information and criteria, and reference model applications are addressed communications technology is necessary to achieve with emphasis on functional interface identification, seamless operation.

IEEE Std establishes the logical connections and data flows, communications smart grid interoperability reference model SGIRM and linkages, digital information management, and and provides a knowledge base addressing terminology, power generation usage. A system of systems approach registration of individuals and close to others to smart grid interoperability provided the foundation registered to participate via webinar.

The publication for the SGIRM as a design tool that inherently allows was achieved on a fast-track schedule, going to ballot in for extensibility, scalability, and upgradeability. The spring , which resulted in successful affirmation by SGIRM defines three integrated architectural the members of the ballot pool. The IEEE perspectives: power systems, communications Standards Board approved the immediate publication of technology, and information technology.

It provides a 4. In transportation and its impacts on commercial and recent years, electric storage has drawn more and more industrial systems. The guidelines can be used by attention as the development of renewable energy utilities, manufacturers, transportation providers, distributed resources interconnected with power infrastructure developers, and end users of electric- systems have been deployed.

Standards that exist and research that is Electric energy storage equipment or systems can be a being performed are pointed out in this document. This document supports utilities in Additionally, requirements on installation evaluation planning for the most economic method of production and periodic tests are included in this standard. Further to support increasing transportation loads.

It allows as stated in , storage equipment and systems that manufacturers to understand the standardization connect to an EPS need to meet the requirements requirements and bring products to fruition as the specified in related IEEE standards.

Standardized test supporting systems and methods are developed and procedures are necessary to establish and verify standardized, and it allows end users to understand compliance with those requirements. These test technologies that can be implemented for their procedures need to provide repeatable results at transportation energy needs. A phased implementation independent test locations and have flexibility to is suggested in this document and is based on economic accommodate the variety of storage technologies and considerations for technologies that are available today applications.

While regional political and established through a combination of type, production, regulatory issues may alter these methods, this and commissioning tests. It is incumbent upon the user of 5. This document does not consider non- topics identified by numerous stakeholders, including road forms of transportation. Examples of such topics follow.

Further, P At the National Renewable that conformance testing be qualified to a Energy Laboratory NREL , for instance, smart grid comprehensive and universally accepted set of interconnection and interoperability testing activities applicable standards so that reciprocity among testing Figure 4 are being extended beyond the initial labs and uniform acceptance of conforming equipment undertakings.

However, it is of paramount importance and best practices is transparent. The time and resources of all helps to accelerate standards coverage for the myriad of individuals and organizations that participated led to the smart grid concerns. Similarly, the timely many of the technical integration issues for a mature completion of priority outgrowth beyond the smart grid, including issues of high penetration of foundational standards will only succeed through distributed generators and electric storage systems, grid dedicated commitment by the individuals and support, and load management.

NA: Not applicable. Reverification of interoperability requirements of this standard might be required when any of the following events occur: — Functional software or firmware changes have been made on the DER — Any hardware component of the DER has been modified in the field or has been replaced or repaired with parts that are not substitutive components compliant with this standard.

UL estimates more than test files are produced to certify a single inverter model under UL SA. Decisions on adoption of normal and abnormal performance categories could require consideration of topics outside the specific scope of IEEE Std These considerations may include technical and non-technical issues and may require dialog among a broad range of stakeholders.

Required 1. Voltage ride-through 2. Frequency ride-through 3. Voltage phase angle change 5. Frequency droop. Open navigation menu. Close suggestions Search Search. User Settings.

Skip carousel. Carousel Previous. Carousel Next. What is Scribd? Introduction Ieee STD. Uploaded by Dream Boy. Original Title Introduction Ieee Std. Did you find this document useful? Is this content inappropriate? Report this Document. Flag for inappropriate content. Download now. Original Title: Introduction Ieee Std. Related titles. Carousel Previous Carousel Next. Jump to Page. Search inside document. Black start-capable: DER that can also energize an EPS that contains no other energy sources Isochronous-capable: Black-start-capable and can regulate V and f in an EPS that does contain other sources Uncategorized: A DER not designed for intentional island operation might be allowed to participate in the intentional island if certain system criteria are met examples in Annex C.

IEC 2. IEEE P Violeta Gloria. For DR greater than 30 kW, the voltage set points shall be field adjustable. For DR less than or equal to 30 kW in peak capacity, the frequency set points and clearing times shall be either fixed or field adjustable.

For DR greater than 30 kW, the frequency set points shall be field adjustable. Flicker is considered objectionable when it either causes a modulation of the light level of lamps sufficient to be irritating to humans, or causes equipment misoperation.



0コメント

  • 1000 / 1000